1) The liquefaction process of our LNG plants adopts the new DMR refrigeration process, which has low energy consumption and effectively reduces the safety risk of the screw. 2) All valves in the cold box are welded, and there is no flange connection in the cold box, which minimizes possible leaks in the cold box. 3) The LNG process is mature and reliable, the process organization is advanced, the operation and maintenance are simple, and only 3 operators are required for one shift. Starts up quickly (startup time is less than 3 hours). It is especially suitable for small skid-mounted natural gas liquefaction equipment. 4) High degree of integration. The skid-mounted design and manufacture of the device reduces the on-site installation workload, shortens the installation time, and saves the floor area.

ONLINE MESSAGE
SHANDONG YOUCHI GAS IMPORT AND EXPORT CO., LTD
ADD:Room 1324, Xinxing International Building, No. 1288 Sanba Road, ETDZ of Dezhou City, Shandong Province China
Tel: +86 (0)534 2102046,+86 (0)534 2100399,+86 (0)534 2100438,+86 (0)534 2109943,+86 (0)534 2108385
Mob: +86 15911121673,+86 18053426932
Fax: +86 (0)534 2100399
E-mail:info@youchigas.com
© 1999-2018 SHANDONG YOUCHI GAS IMPORT AND EXPORT CO., LTD Copyright © 1999-2018 All Rights Reserved